Rover All Comms – Progress Report – 18

A few more hundred lines of code have been written. I still have not absolutely verified the lower level communications protocols to my satisfaction, but I hope to get that done before the end of September. I am satisfied with the hardware design though, and have submitted the gerber files to my manufacturer for cost estimates. I should know more in a few weeks.